338
Report of articles not supplied & of alterations caused by Menors I. Watt & be not sending fittings as & contracts.
x
102 Rivets for fixing Steam chests on Borlen rent 2./0 x 5/5 instead of 270 × 3/4 had to be replaced by others proper seze.
1 Box Spanner for Piston Bolts not supplied 2 Back nuts for boiler feed pipes
"
were
Cutting & screwing feed/en lathe) as prepes not in accordance with drawings (difference
bery 13")
1 Brauch pipe (pattern included) to connect feed from the 2 Donkey Engines, the pipe sent being "only 6" between contres of flanges whereas the centres of pipes on Engines are 9"
& Bolts for holding down pinion frames of Rolling Mills - not supplied.
_
18 Bolts & wacker plates for Coining Press Bed plates & frames - not supplied.
"Charger for the alone as Mesme Me Dory alliage- Warkmen employed
on alterations of feed pipes
reduction supes, gland of water heater (not fitter on). Cutting pieces out of Engine Bedplates to allow Cylinder covers to be taken off without disconnecting
and lifting cylinders from their beds. Grinding steam and blow off Cockit value,
Theme. Engineer 2 days Assistant 34/2 days_
(P) Ins Suglis
(م)
04
184.04.
Foreman of Engineers